EFH "Im Moos", Windisch completed

P153

Our client was able to move in as planned for the start of school after the autumn holidays. The single-family house in Windisch was extensively renovated, and the CO2 footprint was reduced by a good 90% thanks to a pellet heating system and the renovation of the outer shell. From the outside, the alterations to the 1960s building are hardly noticeable; inside, the adaptations to meet the needs of the new users, sit harmoniously with the existing structure.